Planning
Phase II has detailed planning permission for B1 (Light Industrial), B2 (General Industrial) & B8 (Warehousing) uses. The development comprises 10 high-quality industrial units - 9 units in one block and 1 standalone unit.
Design & Build
All units feature: PV roof panels, Deep access yards, Reception/lobby,
Fitted offices & welfare, Generous mezzanine, 8m + eaves, Power floated factory floors, Electric sectional shutter loading doors, 3-phase electric, Gas, Broadband, EV charging.
One final Unit (H6) 15,510 sq ft remaining.
Air conditioning
All first-floor offices in the industrial units will have air conditioning.
Fibre broadband
Openreach are installing their latest ‘FTTP / Fibre to the premises’ infrastructure, which will support the fastest possible broadband speeds.
Minimum eaves height: 8m +
Roller shutter doors: Height: 6.75m Width: 4.00m
Minimum power supply
Each unit will have 3-phase, 100 Amp connection and will be capable of up to 70 kVA.
Ample car and lorry parking
Proposed EPC Rating: A


